|
|
|
While working at Conrail in the mid-1990s I was tasked with introducing the new technology associated with the SD80 MAC through this magazine.
|
|
|
|
Introduction by Dr. Samuels Vice President Operating Assets
|
|
|
|
Overview of SD80MAC innovations.
|
|
|
|
Mechanical Dept. Managers involved with rolling out new technology.
|
|
|
|
Plan showing which trains the SD80s would be tested on.
|
|
|
|
|
Comparison with SD60 and SD50
|
|
|
|
EMD used several subcontractors who each brought their own acronyms.
|
|
|
|
DC Link Safety Issues
|
|
|
|
Explanation of diferent Mechanical Systems written by Chuck Bentler (Currrently with NS)
|
|
|
|
20-710-G3B explained
|
|
|
|
|
SD80 on assembly floor
|
|
|